top of page

Thames Water Leaks

Aug 11
2 min read

Last week, I wrote about the record-breaking drought putting unprecedented pressure on our farmers, waterways, and water supplies. 



Since then, figures analysed by the House of Commons Library and the Liberal Democrats have made one thing much clearer: while residents across Newbury and West Berkshire are being asked to conserve water, Thames Water continue to waste it.


In 2024/2025, Thames Water lost 97.9 litres of water per customer per day through leaks. Across its network, that amounts to 570 million litres of treated drinking water disappearing every 24 hours. 


Shockingly, since Ofwat began tracking water leakage data in 1992, this is Thames Water’s “best” - or lowest - leakage figure to date. 


When households are cutting down on their use, this is not about asking residents to do their bit, they already are. It’s about water companies fulfilling their most basic responsibility: protecting the water supply we all depend on. 


As the climate crises evolves, heatwaves will only become more frequent and intense.  We must, and can, adapt to periods of more extreme weather while taking the urgent action to reduce the emissions driving these changes. So while we roll out a range of crucial policies to transition to a nature-and climate resilient economy, the Government must include measures to reduce leaks in the upcoming Special (Measures) Bill. With the equivalent of 227 Olympic sized swimming pools of water per day being lost, tackling leaks would go a long way to improving the resilience of the sector, and helping to mitigate future shortages. 


At the same time, as the company continues to teeter on the verge of collapse, the latest proposal from its creditor’s does not change the fundamental problem. After a number of constituents have asked me about my view on the proposal, my position remains unchanged: Thames Water needs to be placed into special administration and under a mutual model of ownership, while immediately replacing Ofwat with a powerful new regulator that will hold the company to account for its persistent failures. 


The latest leakage figures are another damning reminder that our water system needs to be rapidly rebuilt - one where investment in crumbling infrastructure is prioritised, customer bills are reinvested in stopping leaks, and sewage dumping in our waterways ends.





  • Facebook
  • Instagram
  • Threads

01635 243510

Promoted by West Berkshire & Newbury Liberal Democrats on behalf of Lee Dillon MP.


Suite 6, Thatcham House, Turner's Drive,

Thatcham, RG19 4QD
 

Privacy Policy

Subscribe to Lee Dillon's Newsletter

© 2024 Lee Dillon MP | All Rights Reserved
Powered and secured by Wix

bottom of page